Before installing vinyl plank flooring determine which type of vinyl plank best suits your renovation needs.
Gluing vinyl plank flooring to concrete.
Each plank has a dry back material which adheres to the subfloor using a water resistant vinyl floor glue.
With minimal effort tiles or planks can be replaced one by one if needed.
Vinyl has a no wax finish but depending on the manufactuerer it can also come in a urethane finish.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
When it comes to glue down vinyl plank flooring you can choose self sticking planks or planks that require a coat of adhesive on the subfloor.
If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring.
What is glue down vinyl plank flooring.
To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler.
Vinyl plank flooring has become a popular option in homes and businesses because of the wide range of styles and the incredible durability of the flooring.
This cost effective flooring can offer the look of real wood in rooms that hardwood flooring is not an option.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
Vinyl planks can be sorted into three main categories based on their installation method.
Since the glue resists water glue down luxury plank vinyl is great for many different settings including.
Gripstrip click lock and glue down.
It is one of the cheapest solutions and at the time of writing it could set you back just a few hundred bucks depending on the size of the area you are covering.
Simply put glue down vinyl plank is when the product is glued down to the subfloor.
If a floor plank and underlayment or adhesive will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring.
Vinyl planks are a great option if you want durable flooring but don t have a ton of installation experience.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.