Roof safety anchor systems.
Galvanized roof anchor installation.
When framing the roof the spacing for roof trusses should not exceed 24 inches 61 cm and purlins should not exceed 36 inches 91 cm apart.
Roof anchors must be installed and spaced a maximum of 20 ft.
Remove the roof top anchor and drill four holes at the locations marked in the previous step.
The drawing below illustrates the adhesive roof anchor and the installation methods available.
Adhesive roof anchors adhesive roof anchors are corrosion resistant stainless steel and or hot dip galvanized fully tested to conform to csa standards and ontario ministry of labour regulations and guidelines.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Methods of installation range from mechanical attachment like through bolting and welding to existing structure cast in place during construction where by the anchor becomes part.
Recommended spacing is between 6 and 10 ft.
Install a corrugated roofing wall connector panel to a wall with roofing sealant when installing panels for a patio cover.
Commercial roof anchor installation instructions part 48591 recommended installation.
With the roof top anchor positioned per the site plan and using the anchor s mounting plate as a template mark the locations of the four large holes in the mounting plate on the roof deck figure 8 1.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Installation around the perimeter of the leading edge areas is recommended to ensure compliance and allow the user to easily switch from anchor to anchor.